Workover and Completions-(Well Intervention) Training
From $5250 per attendee
Email Course Course PDFAvailable Courses
Dubai
24 March, 2025 - 28 March, 2025
Book CourseHouston
7 April, 2025 - 11 April, 2025
Book CourseLondon
19 May 2025 - 23 May, 2025
Book CourseOnline
16 June, 2025 - 20 June, 2025
Book Course
Enquire About This Course
Ask us about this course and a course tutor will be in touch.
Enquire About This Course Location
Ask us about this course and a course tutor will be in touch.
Email This Course
Send this course to yourself or to a friend/colleague.
Course Information
- Course Content
- Course Description
- Course Objectives
- Who Should Attend
- CPD Unit
Course Content
• Workover and Completion Methodology
• Risk Management
• Well Problem and Analysis
• Well Control
• Cement Bond Logs
• Perforating
• Fracture Gradient
• Sand Management
• Cement Squeezing
• Acidizing
• Rigless Operations
• Coil Tubing
• Fishing Operations
• Completion Management
• Production Casing & Tubing Design
• Artificial Lift
• Conclusions
Day 1
Workover and Completion Methodology
• Production System
• Purpose of Well Completion
• Types of Well Completion
Risk Management
Well Problem and Analysis
• Production Problems
Well Control
• Live Well Intervention
• Kill Fluids
Day 2
Cement Bond Logs
• Evaluation
• Tool Design
• Interpretation
• Radial Cement Evaluation
Perforating
• Types of guns
• Perforation methods
Fracture Gradients
• Fracture pressure determination
• Field determination
Sand Management
• Sand Control
• Reasons for sand production
• Problems with sand production
• Prediction of sand production
• Control methods
• Latest Technologies
Day 3
Cement Squeezing
• Squeeze operations
Acidizing
• Matrix acidizing
• Fracture acidation
Rigless Operations
• Typical equipment
• Snubbing units
• Wireline units
Day 4
Coil Tubing
• CT design
• CT system components
• CT applications
Fishing Operations
• Fishing tools
• Fishing with tubing
• Fishing with wireline
Day 5
Completion Management
• Project Management
• Communication
Production Casing & Tubing Design
• Casing design
• Tubing design
Artificial Lift
• Usage of AL systems
• Selection of AL system
Conclusions
Course Description
Workover and Completions-(Well Intervention) Training Course
This 5-day course emphasizes the role of engineers and field operators in planning and executing the Intervention Operations to maintain and increase field production and thus add to the profitability and recoverable reserves. It also emphasizes the significance of the team concept as a factor in optimizing operations success. The course is highlighted with open discussions and problem solving shared by the instructor and participants.
By the end of this course, attendees will have an understanding of the industry’s advanced technologies in field of designing and executing Intervention jobs in their respective operations. They will have knowledge of selecting the appropriate method for the particular operation and perform the task in a safe and efficient manner.
Course Objectives
To provide an in-depth knowledge of the theoretical and practical aspects of Well Intervention operations. At the end of the course delegates will learn about the many processes involved Well Intervention operations, about Well Intervention equipment, how to plan a Well Intervention, and how to execute a Well Intervention operation.
Who Should Attend
Drilling, completion, workover and production engineers and managers. Reservoir and geology
engineers, field maintenance supervisors and operators. Service companies and equipment
manufacturing engineers. Safety engineers and personnel selected by their companies for attending special training courses.
CPD Unit
Continuing Professional Development
35 HOURS CPD