Advanced Deepwater Drilling and Completions Training
From $5250 per attendee
Email Course Course PDFAvailable Courses
Online
24 March, 2025 - 28 March, 2025
Book CourseDubai
19 May, 2025 - 23 May, 2025
Book CourseHouston
9 June, 2025 - 13 June, 2025
Book CourseLondon
7 July, 2025 - 11 July, 2025
Book Course
Enquire About This Course
Ask us about this course and a course tutor will be in touch.
Enquire About This Course Location
Ask us about this course and a course tutor will be in touch.
Email This Course
Send this course to yourself or to a friend/colleague.
Course Information
- Course Content
- Course Description
- Course Objectives
- Who Should Attend
- CPD Unit
Course Content
Deepwater E & P challenges
Worldwide drilling activities
Deepwater operating guidelines
Comparing the offshore regulatory regimes
HSE management
Risk management
Subsea well control
Blowout contingency plans
Deepwater well design
Deepwater well construction
Drilling riser management
Subsea Drilling and Production Equipment
Deepwater drilling procedures
Well completions
Relief well operations overview
Day 1
Introduction to Subsea Drilling Systems
- History of Offshore Drilling
- Terminology of Deepwater
- Influence of Deepwater
- Features of Deepwater
- Drilling Units
Worldwide Deepwater Activity
- Summary of International Activities
- List of Current Deepwater Drilling Units
Deepwater Challenges
- Availability of Funds
- Integrated Asset Management Team
- Requirement of Specialized Equipment
- Awareness of Risks and Challenges
Deepwater Drilling Concerns
- Deepwater Drilling Vessel Selection
- Wellhead, Riser and BOP Stack
- The effects of water depth Jetting the 30” Foundation pile
- Environmental Window
- Riser Margin
- Lack of Overburden pressure
- Mud and Bulk Volumes
- Flow Rate Requirements
- Cementing
- Concurrent operations during anchor handling, open water work
- Hydrates
- Deepwater Well Control Considerations
- Shallow Water Flow
- Shallow gas
- Losses
- Effects of Hydrate Formation
- Expansion of gas in the riser
Day 2
Risk Management
- Risk Management Process
- Risk Assessment
- Risk Analysis
- Risk Reporting and Communication
- Risk Treatment
- Risk Monitoring
- Hazop Analysis
Drilling Hazard Management
- Performance Begins with Planning
- Risk Assessment
- Mitigation Methods
Deepwater Well Control Considerations
- Shut-in Procedures
- Circulating Pressures
- BOP Stack and Control System
- Duel Shear Ram Requirement
- ROV Intervention
- Shallow Water Flow
- Shallow Gas
- Effect of Hydrate
- Expansion of Gas in the Riser
- Ultra-Deepwater Blowout
Blowout Contingency Plan
- Response
- Data Document
- Logistic
- Roles and Responsibilities
Day 3
Seas and Weather
- Buoy Development
- Sensor Description
- Ocean Currents
- Gulf of Mexico Loop Current
Positioning of the Rig
- The Grid System
- Measurement Methods
- Coordinate System
- Mooring and DP Capability
- Motion Compensation
Well Design
- Objectives for Deepwater Exploration Wells
- Environmental Factors
- Water Depth and Seabed Condition
- Weather and Current
- Rig Selection, Rig Upgrades, and Rig Operating Limits
- Survival Limits
- Disconnect Operations
- Subsea Operating Limits
- Deck Loads
- Temperatures
- Subsurface Hazards
- Surface Foundation Pipe
- Fluids Program
- Cementing Program
- Completions
- Well Control
- Well Testing
Day 4
Drilling Fluids
- Fluid Response to Temperature
- Subsalt Wells
- Shallow Water/Gas Flow
- Hole Cleaning
- Gas Hydrate
Cementing
- Mud conditioning
- Preparation for cementing
- Cement classes
- Cement additives
- Laboratory Testing
- Cementing Equipment
- Cement Mixing
- Cement Displacement
- Quality Control
Subsea Drilling Equipment
- Subsea Wellhead
- System Consideration
- Subsea BOP Stack System
- BOP Control System
- Riser Integrity
- Riser System
- Lower Marine Riser Package
- Riser Running Equipment
Day 5
Deepwater Drilling Procedures
- Jetting 30”/36 Construction Pipe
- Jetting Tools Design
- Post Jetting Considerations
- Drilling 26” Hole and Running 20” pipe
- Running BOP stack and Riser
- Drilling 12 ½” Hole, Running 13 3/8” Casing
- Drilling the 12 ¼” Hole, Running 9 5/8” Casing
- Well Completion
Deepwater Completion Systems
- Open hole Completions
- Cased hole Completions
- Perforating
- Frac Pack
- Intelligent Completions
Offshore Operating Procedures
- Health Safety and Environment
- Casing and Cementing Overview
- Deepwater Drilling Equipment
- Equipment Definition
Course Description
Advanced Deepwater Drilling and Completions Training Course
This Course is designed for technical persons desiring to pursue their experiences in deepwater and Ultra deepwater ever growing operation and techniques. This course highlights the challenges of venturing into the deepwater generation and covers operational guidelines, risk management and well control concepts.
Abandonment procedures as per regulators requirements and relief well operations overview are reviewed in details.
Course Objectives
Who Should Attend
Operator persons who are involved in deepwater operations and have relevant experiences and contractors person in similar assignment and operation categories. Logistics managers, Finance controllers, safety officers and management persons of deepwater operating companies.
Prerequisites
Sound knowledge of deepwater and ultra-deepwater Drilling and Completion Operations, well control, offshore emergency and safety practices and cost control experiences.
CPD Unit
Continuing Professional Development
35 HOURS CPD